漂块,漂砾,漂石;巨漂砾;
The construction technology of well point unwatering method, manual pore-forming, manual cut deep concret and erratic boulder, static blast are applied in the foundation project, which solves the problem of the new tower built in the old site.
桩基础方案采用井点降水、人工成孔、深层混凝土和大漂石人工切割与静力爆破施工工艺,成功解决了原塔旧址新建问题。
简答网 · 双语新闻
简答网 · 高考英语
简答网 · 四六级英语
简答网 · 双语娱乐资讯
简答网 · 初中英语作文